The Risk of Budgeting a Retrofit Before Understanding Site Conditions

An aging pump station isn’t required to shut down before it causes problems. While it can transfer stormwater and wastewater every day however, the pump station could struggle to keep up with demands that are high. It may also require regular maintenance. The equipment is functional, but its original design may no longer reflect the conditions around it.

Recognizing this difference is important for municipalities, developers and facility managers when planning upgrades to infrastructure.

Image credit: romtecutilities.com

You should look past the equipment that’s not working properly.

The retrofit of a wastewater liftstation should begin by assessing the entire system, and not just the pump. Engineers should examine the mechanical and wetwell components and electrical components as well as control systems, drainage pipes, current pumping requirements, and control systems.

The condition of a well is extremely important. It might be possible when the structure is in good condition that it be kept and upgrade the equipment. Costs for construction could be reduced as compared to constructing a new station. Retaining existing infrastructure is only worth it for if it can support the proposed improvements.

The service area has changed.

A former wastewater plant could serve additional homes, industrial buildings or commercial buildings.

These changes can affect flows and operating demands. Successful lift station rehabilitation therefore requires more than restoring the original equipment specifications. Engineers should assess current and anticipated flow rates, total dynamic head capacity of the equipment, and operating reliability.

It’s not enough to simply purchase a bigger pump. The new equipment must be compatible with the existing pipes electrical supply, controls and other components. When one part is upgraded the result could be problems with other parts.

Stormwater Retrofits Have Different Priorities

A retrofit of a stormwater pumping station adds more considerations as the runoff may change drastically in response to rainfall and the development around. A station that serves a detention pond may experience different inflow patterns from one that receives water through storm drains. The quantity of runoff reaching the station is affected by new pavements and parking spaces, or changed drainage infrastructure.

Before recommending a major upgrade of the stormwater facility, engineers must look over the drainage areas and peak flows anticipated and the storage capacity available along with discharge conditions and the pump’s performance.

These results can be used to determine whether modernization of the equipment will suffice or if the station is in need of larger reconstruction.

Plan Construction Before Interrupting Service

The way the station functions in rehabilitation is a subject which is frequently ignored. Wastewater systems generally cannot be removed without a plan for continued flow management.

Based on the space available and the project’s requirements the construction could involve temporary bypass pumps or the installation of new infrastructure adjacent to the operating station.

Stormwater projects also require a careful planning due to the fact that the system could be needed in the event of an unexpected rainstorm. The engineering plan must contain the installation sequence in addition to temporary operations and equipment integration.

The finished System is much easier to use

Romtec Utilities is a provider of engineering services for sites as well as supply and solutions for wastewater and Stormwater Pumping Applications.

The retrofit method evaluates the structural, mechanical, electronic, and communications components will remain, and which ones require replacement. The company provides owners with preliminary designs, budget estimates and options for projects.

Following installation, startup testing, commissioning, operator training and operation and maintenance documentation will ensure that the upgraded station performs in accordance with the specifications of its design. Operators need to be able manage and comprehend the system following the successful rehabilitation.

Upgrade Your System and Not Limit Its Upgrades to its Age

A pump station that is older might not require to be replaced completely. Even if electrical and mechanical equipment is outdated, some structures can still be beneficial for years to come. It is crucial to decide what can be kept safely and cost-effectively, while making sure that the final product is compatible with future and current demands.

Owners are able to make better investment choices by studying the operating conditions as well as structural integrity and hydraulic requirements in conjunction.

The aim isn’t just to make an aging station operate again. It’s about making sure that the upgraded system is prepared for the task ahead.