Designing Wastewater Infrastructure Around Growth Instead of Catching Up Later

Engineering would be considerably easier if water came at the same speed.

It isn’t.

The amount of wastewater entering the residential system can vary throughout the day. Industrial and commercial facilities could have operating peak times. Stormwater flow is affected by weather conditions. The demand for clean water also fluctuates according to the type of application.

Image credit: romtecutilities.com

As a result, designing a pump station isn’t simply a matter of identifying one flow number and selecting equipment capable of meeting it. Engineers must be aware of the conditions that the equipment will be exposed to.

Take into consideration the operating conditions and not only the maximum Capacity

The highest flow is crucial however, it is just one element of the station’s operation. Let’s say that a wastewater system is designed to handle a flow. Most of the time, the incoming flow is lower. The station is still required to operate appropriately during those ordinary intervals.

This leads to questions on wet-well capacity, pump operation, control, head conditions and how the equipment performs as demand changes.

The design of a well engineered package pumps system is based on the actual site requirements, instead of focusing on the max capacity of the pump.

The daily rhythm of wastewater

In the life-cycle of a wastewater lift station influent conditions may alter.

The system must collect wastewater and activate its pumps in accordance with the established control plan for the station. The dimensions of the structural structure, the pumping equipment, valves electric components, and controls all have roles in that process.

The design may also include aspects specific to the particular site. Romtec Utilities is able to integrate additional equipment like grinder vaults and odor control equipment, based on the particular application. This results in a station designed to meet the needs of the particular project, instead of being a general design that can be applicable to all wastewater sites.

Stormwater Flows Change Much More Rapidly

Stormwater is a distinct operation. A stormwater lift station could see relatively little activity during dry conditions, and then encounter significant increases in flow during an event of weather. The station may be part of a larger flood-control treatment, detention, or drainage plan, making the surrounding stormwater plan an integral part of the design.

Romtec Utilities evaluates factors including flow rates that are required as well as head conditions, size of the system, site requirements, and environmental considerations when developing the systems.

Stations used for commercial developments can be very different from those designed for municipal stormwater applications.

Head Conditions Are Important Alongside Flow

Moving 1,000 gallons is only part of the engineering issue. Engineers also have to determine where the water is going to go and what resistance to overcome by the pumping system.

Pumps are able to operate with different head sizes based on the configuration of the system like the piping as well as discharge conditions.

This connection between head and flow is another reason why choosing the right pump solely on its ratings isn’t enough. The technology of the pump and station layout must match the hydraulic requirements of the application.

Design for the conditions the station will experience

Romtec Utilities creates customized pumping system for wastewater, stormwater and clean water applications. They also develop systems for boosters, industrial and other uses. Its process can include initial design and budgeting plans, complete sets of plans as well as documentation, startup, testing, and commissioning.

The basic principle of engineering is that a real pumping systems don’t work under a single set of conditions.

They also need to take into account particular needs of the project’s hydraulic system, in addition to the fluctuating demand, flow, and requirements. This fact is something to consider when designing a productive station.